Preparation : Clean well the surface before starting the application.
Pour 1 part of Polish Parquet in 5 parts of water.
In a room of 200 sq ft, use 200 ml of product for 1 liter of water.
Application : Using a cotton rag or a stain applicator, spread the preparation evenly on all the surfaces.
Let dry for 20 minutes.
Application tools : Cotton rag, Stain applicator.
Drying time : 20 minutes