I'm planning to use Osmo Country Colour finish in charcoal on my recently built pergola. The pergola is built with pressure treated wood so I was wondering if there should be some wait time before I apply the finish to let the wood dry out?
4 to 6 weeks after construction is what is recommended before finishing to allow the moisture content to come down and the PT chemicals to come out so that the Osmo can penetrate properly.