Product preparation
Vigorously shake the container and let stand 10 minutes before applying.  
Application
The application must be made at an ambient temperature above 15 °C. Apply varnish in the direction of the wood grain using a synthetic bristle paintbrush, a foam applicator or a 10 mm paint roller. Between coats, let it dry for 3 hours before sanding with 220 grit sandpaper.  
Number of coat
- On bare or stained floor: 3 coats  
 
- On previously varnished floor: 2 coats  
 
Drying time
- Between coats: 3 hours  
 
- Cautious traffic: 8 hours  
 
- Put back the furniture: 48 hours  
 
- Put back the carpet: 7 days  
 
- First damp cleaning: 10 days  
 
Covering
100 to 130 sq ft / L